Showing posts with label UFO 2013. Show all posts
Showing posts with label UFO 2013. Show all posts

Wednesday, November 6, 2013

What's In Progress Wednesday?

It's Getting Easier Street...
So I told you a few months back that I went to the local Quilt Shop to pick up the Easy Angle ruler to work on Bonnie Hunter's Easy Street mystery Quilt.  Well, what I ended up buying was the Easy Angle 2 ruler which the shop person assured me was the two rulers combined...let me tell you, they are not.  Since this was my first experience in making flying geese this way, it was not instinctive on how to make the flaps.  Looking back on other projects I had realized that I had incorporated flying geese in other projects, but just didn't know it!  Most patterns have you make it with one rectangle and two small squares with the pencil line on the back.  Needless to say I am feeling like an expert after this mystery quilt!!  I had this idea of just completing half of the required blocks but I wasn't paying attention and ended up cutting and sewing the total amount of flying geese...



As You can see the colors I chose to do at first was neutrals with a cream background, with highlights of taupe and several brown fabrics in place of the purple she chose.  It may come as a surprise, but I have been waiting to check out each step until the mystery quilt calls for it.  I have glanced at finished quilts, but the picture is in no way solidified in my mind so I am not quite sure how this quilt will turn out.

I am going to get this quilt completed; hopefully soon because I have 1 month until Bonnie Hunter releases her new mystery quilt for this year (Check it out HERE).  My Hope is that this year I can follow along and keep up...I have already picked out some fabrics, though I am substituting teal/turquoise for the green she is calling for because I need all the greens I can get my hands on for a surprise quilt I have been making for a friend.

I am linking up to:  WIP Wednesday with Lee @Freshly Pieced
*\o/* Cheers
Shanna 

PS** It turns out I have had very good luck recently, so I am having a drawing for Four more traveling stash boxes!!!  Please consider letting it visit your house.  Check out my post (with pictures) HERE, leave a comment on that post to be entered in to win it (US Residents only, sorry).  There are 2 more delicious boxes being given away, to find out more about those boxes click over HERE, and to read about the guidelines go HERE.

***For International followers I will be having a giveaway specifically for you starting November 17th. So please be looking for it!***


Wednesday, March 27, 2013

Whatcha Doing?

I am trying to get projects finished each quarter as part of a competition as well as to keep me going, but I am going to stop feeling so neurotic about it...maybe.  I will post my Mater list at the beginning of a quarter, the mid-way point, and at the end of one quarter, then put up a new list for the following quarter.  You see, I have hidden WIP projects that I don't know what they are, I just know they are there!  So I plan to sneak them onto my list every quarter, lol.

So instead of posting my massive list each week of unfinished (thorns in my flesh) projects, I am going to highlight a project that I have either just started or the one I am focusing on for the week.  In my mind I work from Wednesday to Wednesday with the hope of having the project completed the following Friday.




For this week I want to share my scattered Triangles project which I got the idea HERE and then saw another like it HERE.  I used 6" Charm squares of Sommersalt and a basic white on white Print I bought at Joann Fabric's on a scary Black Friday once.  You will probably see the swirling design once I get this baby into better light!

What's left to do:
I need to re-cut the end-cap triangles (they got misplaced), finish rearranging sections, sew everything together, add a border (possibly), backing to be assembled, quilt, add binding, and then enjoy!

I also also working on the quilts from HERE!

*Shanna


Sunday, March 3, 2013

UFO/WIP10: Marching On...

So we are two months down, with one month to go in the 2013 Finish-A-long.  I am doing another full update so this post shall be picture heavy, so please excuse the length, or well at least it shall be much longer than my usual long posts!  I AM making headway and I WILL get these projects completed eventually, even if it is not this Quarter.  I guess the biggest unknown is going to be what other unfinished projects will I find when we are able to unpack more of the boxes from our move last May??!!  I am dreading that as my list will look impossible then.  Sorry for using some old shots, I am hoping to take some new photos in a couple of weeks when things are less scattered.

Still In Process:

(Wonky) Christmas Advent Calendar:  I HAVE FOUND MATCHING THREAD!!!!! 
Dot Explosion Quilt:  I need to finish assembling rows, now going to make this one be a toddler bed/Crib Quilt sized, I was thinking Twin before, but it just wouldn't work in my brain.  
Easy Street Mystery Quilt:  all the 4-patch blocks & Flying Geese are assembled (I am making half the blocks required for a smaller quilt ), I am currently using this as my Leaders & Enders project in between and around other projects (See Quiltville blog). (Need updated picture)

Fish Quilt:  Frustrating and hated pattern but I am trying to complete anyways. Very Low on List.

I'll Fly Away Quilt:  I plan to use this one as my Leader/Enders project after the Easy Street Quilt.
March's Scrap Challenge Projects:  1 Project kit ready to go with fabric cut

Martinique Strip Quilt:  Need to assemble more strips, some are sewn into two strip blocks
Party Dress:  Close to a finish! [Project was Ziona's Birthday Dress]
Poppy Wall Hanging:  No progress for a while
Rainbow Block Quilt:   I have made this my orphan rainbow block quilt

Rose Star Quilt:   I have figured out a new pattern for this quilt; currently in 4-patch and 2-patch segments.  I plan to order some cream/off-white and some marble rose (Image) fabrics
Summersault Patch Quilt:  Need to assemble more strips, some are sewn into two strip blocks

Limbo-landed Items:
Chain Quilt:  Top is complete, back & bindings in process [POST]

Red Eye Quilt:  Top & backing complete, bindings are in process [POST]
Squares & Patches Quilt:  Top & backing complete, bindings are in process [POST]
Time Warp Quilt:  Top is complete, back & bindings in process [POST]
Zig-Zag Quilt:  Top is complete, back & bindings in process [POST]

New Items not on First Quarter List:
Birthday Bibs:  Started, post to come soon, hopefully as a finish!
Cousin #2's Dress:  Need to gather & make button loops and finish
Modern Squares Table Runner:  Needs backing, sandwiching and stitching!
Scrappy Hearts 1 Wall Hanging:  All of the mini-hearts complete, assembly required.
Scrappy Hearts 2 Wall Hanging:  Fabric cut (upper right quadrant), need to make hearts
Spring Checkers mini-quilt:  Pinned, but set to the side until I make up mind about colour of thread.

Completed Items:
Four Squares Weekend Quilt:  Complete.  [POST]
Playdate Dress:  Complete.  [POST]
Two + Two Blouse:  Complete.  [POST]

Completed Items not on First Quarter List:
Coming Soon


By the way, thank you for your patience with me on repeating items I have been focusing/featuring as I have been sick and have not been up to my peak level of, well, anything to be honest.  I have been required to take a rest this next week and plan to takeoff time from any most crafting while I recover.  Plus my husband will be working on rearranging our bedroom/craft room for me!  I will post some pictures when it is complete to show you the changes we will make.

Tomorrow I will get you caught up on all the BOM blocks I was working on yesterday, so see you later!


* Shanna

Are you thinking of going scrappy or focus on your stash this year?  If you have time, link up your posts each month with your own personal challenges.  Check out March's post:  HERE and the Flickr group:  A Scrapful Life..

I am linking up to:


2013 Finish-a-long hosted by Leanne @She Can Quilt
UFO Sunday hosted by Leah @ The Free Motion Quilting Project
WIP Wednesday hosted by Lee @ Freshly Pieced

Sunday, February 24, 2013

UFO/WIP List 9

Life In Progress:
So I am making progress, just a bit slow perhaps.  I had left over blocks from my Friday Finish so I put together a little table runner.  I have it laying on a black rug to see if I thought a black border might be a nice touch; what do you think?  I also decided to put together a little Checker board mini-quilt from yet more left-over bits.  It may not be the final checkboard I make as it is turning out super cute!


Still In Process:
Christmas Advent Calendar:  I HAVE FOUND MATCHING THRED!!!!! 
Dusty Rose Quilt:   I have figured out a new pattern for this quilt; currently in 4-patch and 2-patch segments, needs some love.
Dot Explosion Quilt This needs some reworking in concept, I almost have this one figured out.
Easy Street Mystery Quilt:  all the 4-patch blocks & Flying Geese are assembled (I am making half the blocks required for a smaller quilt ), I am currently using this as my Leaders & Enders project in between and around other projects (See Quiltville blog).
February's Scrap Challenge Project:  Partly pieced, one of my main Focus this week 
Fish Quilt:  Frustrating and hated pattern but I am trying to complete anyways.
I'll Fly Away Quilt:  No Progress yet.  I plan to use this one as my Leader/Enders project after the Easy Street Quilt.
March's Scrap Challenge Projects:  1 Project kit ready to go with fabric cut from chosen pattern
Martinique Strip Quilt:  Need to assemble more strips, some are sewn into two strip blocks
Party Dress:  Close to a finish! [AKA Ziona's Birthday Dress]
Poppy Wall Hanging:  No progress for a while
Rainbow Block Quilt:    I have made this my orphan rainbow block quilt
Summersault Patch Quilt:  Need to assemble more strips, some are sewn into two strip blocks

Limbo-landed Items:
Chain Quilt:  Top is complete, back & bindings in process [POST]
Red Eye Quilt:  Top & backing complete, bindings are in process [POST]
Squares & Patches Quilt:  Top & backing complete, bindings are in process [POST]

New Items not on First Quarter List:
Birthday Bibs:  Started, post to come this week
Cousin #2's Dress:  Paused, making some changes.
Scrappy Hearts Wall Hanging:  mini-hearts compete, assembly required.
Modern Squares Table Runner:  Needs backing, sandwiching and stitching! (See above)
Spring Checkers mini-quilt:  Made from the left over bits plus some stash pieces (See above)

Completed Items:
Four Squares Weekend Quilt:  Complete.  [POST]
Playdate Dress:  Complete.  [POST]
Two + Two Blouse:  Complete.  [POST]

Completed Items not on First Quarter List:
Coming Soon

* Shanna
Are you thinking of going scrappy this year?  If you have time, link up your posts each month with your own personal challenges.  Check out February post:   HERE

I am linking up to:
2013 Finish-a-long hosted by Leanne @She Can Quilt
UFO Sunday hosted by Leah @ The Free Motion Quilting Project
WIP Wednesday hosted by Lee @ Freshly Pieced

Sunday, February 17, 2013

UFO/WIP 8


So we are at the mid-way point for the first quarter and I am getting excited about the number of finishes on my list!  I made strong in roads to my WIP/UFO List last month but no complete finishes. Now we are well into February and I have 2 pieced tops (1 have backing & 0 have binding prepared). Next I tackled some clothing items as I wait to buy batting to finish off those quilts, 2 clothing projects were completed off my list. Now we are getting into some of the trouble areas on my list.  Either conceptually or some other issue it seems.  I continue to use the Easy Street Mystery Quilt as my "Leaders/ Enders" project in between and around other projects which makes it feel less daunting.  


I promise a better Picture next time!
Over the next couple of weeks I will be focusing on my February Scrap Challenge Project which I have been quietly working on in the background.  I don't know what to call it yet except "Scrappy Paperclip" which is based off the Paperclip Quilt I made August 2011 [see Post].  It is slow going because I have to work on it in the evenings when Miss Z is completely asleep so I plan take pictures during the process for a Tutorial.  I actually still get requests for a tutorial for this one, so I thought this would be a great opportunity to make one and complete my challenge at the same time.  I am almost finished with my January Challenge Project and its Tutorial!!  

On the Friday Night Sew-in on Thursday I finally sat down and took the time to get the 4 patch & Squares Quilt blocks trimmed and ready to sew together!  This Project is really getting exciting because the colors have just turned out super so far.  Take a look:




Still In Process:
Christmas Advent Calendar:  I have an idea...besides throwing out the window of a moving vehicle...I am just going to use another thread that purposely doesn't match the first thread.  I have to think more about this before committing.  I really, really don't want to rip out this thread for the 2nd time.
Dusty Rose Quilt:   I have figured out a new pattern for this quilt; currently in 4-patch and 2-patch segments, needs some love.
Dot Explosion Quilt This needs some reworking in concept, I almost have this one figured out.
Easy Street Mystery Quilt:  all the 4-patch blocks & Flying Geese are assembled (I am making half the blocks required for a smaller quilt ), I am currently using this as my Leaders & Enders project in between and around other projects (See Quiltville blog).
February's Scrap Challenge Project:  Partly pieced, My Focus this week 
Fish Quilt:  Frustrating and hated pattern but I am trying to complete anyways.
I'll Fly Away Quilt:  No Progress yet.  I plan to use this one as my Leader/Enders project after the Easy Street Quilt.
March's Scrap Challenge Project:  Project kit ready to go with fabric cut from chosen pattern
Martinique Strip Quilt:  Need to assemble more strips, some are sewn into two strip blocks
Party Dress:  Close to a finish! [AKA Ziona's Birthday Dress]
Poppy Wall Hanging:  No progress for a while
Rainbow Block Quilt:    I have made this my orphan rainbow block quilt
Squares & Patches Quilt:  Squares are trimmed up ready to assemble!
Summersault Patch Quilt:  Need to assemble more strips, some are sewn into two strip blocks

Limbo-landed Items:
Chain Quilt:  Topis complete, back & bindings in process 
Red Eye Quilt:  Top & backing complete, bindings are in process [POST]

New Items not on First Quarter List:
Birthday Bibs:  Started, post to come this week
Cousin #2's Dress:  Paused, making some changes.
Scrappy Hearts Wall Hanging:  mini-hearts compete, assembly required.
Completed Items:
Four Squares Weekend Quilt:  Complete.  [See POST]
Playdate Dress:  Complete.  [See POST]
Two + Two Blouse:  Complete.  [See POST]

Completed Items not on First Quarter List:
Coming Soon

Now that we are back from a nice family luncheon  I am off for a quick nap, but tomorrow I shall get going again!
* Shanna
Are you thinking of going scrappy this year?  If you have time, link up your posts each month with your own personal challenges.  Check out February post:  HERE

I am linking up to:
2013 Finish-a-long hosted by Leanne @She Can Quilt
UFO Sunday hosted by Leah @ The Free Motion Quilting Project
WIP Wednesday hosted by Lee @ Freshly Pieced

Wednesday, February 13, 2013

WIPs & Friday Night Sew-In plans


Last Friday I pulled out those purple UFO clothing items to fiddle with and to take new pictures; they were going to be my focus for the early part of this week, but it just didn't happen.  I have been struggling to get this white part laying down perfectly and pinned, my hands just are not cooperating with me here.  With the temperatures already getting warm here (70's-80's), my hands are starting to swell again which turns my fingers into sausages!  I am not afraid to admit I am failing on getting this set in.  Thankfully a Friend came over on Saturday to help me get it set in place and I cannot begin to tell you how grateful I was for that!  Sunday my Husband drove me over to Jo-Ann's to buy some buttons and a zipper.  He has requested that the next dress I make have a zipper as he is in charge of Sunday morning dressing of Miss Z and she is a bit wiggly!

Dress sleeve cuffs
Now much hasn't been worked on the dress as other things have come up so...mainly house-cleaning.

These are the projects that I plan to work on Thursday for the Friday-Night Sew-in.  I cannot participate exactly on Friday night as family is coming in town for the Birthday party on Saturday.  Hopefully Everyone is okay with me participating a day early this month!
Playdate dress:  Adding the Yoke is giving me fits still

Two Plus Two Blouse:  Sleeves have been inserted, everything else still needs to be done.


These are the other 3 projects I am focusing on tomorrow night:

1.  Miss Z's Birthday dress:  I accidentally stripped out the gathering threads while working on this project, tossed it under my work table and promptly forgot about it.

2.   Birthday Bibs:   Someone has contacted me to commission a couple special birthday bibs for their Grand-daughter's first birthday, I will tackle this project if I have time.  I will probably make one for Miss Z while I am at it!

3.  Finish up the HST Quilt:  It is my Scrap Challenge Project for January and I almost have the top completed.  I really want to finishing making the Tutorial for it as well, but that might not all happen in one night!

You can see the full UFO/WIP List for the Finish-a-long first quarter (with pictures) HERE

I am linking up to:
2013 Finish-a-long hosted by Leanne @She Can Quilt (Via Flickr when projects are complete)
WIP Wednesday hosted by Lee @ Freshly Pieced

* Shanna

Sunday, February 3, 2013

UFO/WIP 6


I am still so happy that I made the link-up party for the first quarter, but now its time for an update on my list!  I made strong in roads to my WIP/UFO List in the month of January.  I Have 2 pieced tops (1 has backing complete & neither have binding prepared). Next I tackled some clothing items as I wait to buy batting to finish off those quilts, no clothing projects were actually completed off my list though. Nothing is counted unless it is completely finished though so I better get working!!


Still In Process:
Christmas Advent Calendar:  Rip out all the stitching again, I ran out of thread on accident can purchase exact color. [enter in head banging against wall picture here, lol]  I wish I could steal the batting!
City Weekend Project:  Working on ripping stitches out, need to pick out joining/sashing fabric.  This is now going to be one quilt--Writing a post about it this week

Dusty Rose Quilt:   I have figured out a new pattern for this quilt; currently in 4-patch and 2-patch segments, needs some love

Dot Explosion Quilt This needs some reworking in concept.

Easy Street Mystery Quilt:  all the 4-patch blocks & Flying Geese are assembled (I am making half the blocks required for a smaller quilt ), I am currently using this as my Leaders & Enders project in between and around other projects (See Quiltville blog).
February's Scrap Challenge Project:  Partly pieced, process post coming soon
Fish Quilt:  Frustrating and hated pattern but I am trying to complete anyways.
HST Scrap Project:  Fabric Trimmed, squares set ready to sew

I'll Fly Away Quilt:  Pieces cut but this one is a long time project.  Since I am planning for this to fit our bed there with be many, many flying geese that needs to be made; I am guessing this one will take 3 months in among all the other projects.
March's Scrap Challenge Project:  Project kit ready to go with fabric cut from chosen pattern
Martinique Strip Quilt:  Need to assemble more strips.


Playdate Dress:  I had forgotten about this dress until I was organizing

Poppy Wall Hanging:  No progress for a while
Rainbow Block Quilt:    I have made this my orphan rainbow block quilt
Squares & Patches Quilt:  I have almost made a choice on the ideas you gave me! 


Summersault Patch Quilt:  Need to assemble more strips, some are sewn into two strip blocks

Two + Two Blouse:   I had forgotten about this blouse until I was organizing

Z's Birthday Dress:  Bodice is mostly completed, skirt is pinned and fitted to space, Sash is completed. 

Limbo-landed Items:
Chain Quilt:  Top is complete, back & bindings in process; in limbo until new batch of batting.
Red Eye Quilt:  Top & backing complete, & bindings are in process [POST]in limbo until new batch of batting.


Completed Items:
Coming Soon

New Items not on First Quarter List:


C2's Dress:  Bodice is Assembled, Skirt is cut, Sash is complete, waiting on measurements for length

Scrappy Hearts:  A Wall Hanging for Decor using the Flirt line of fabric



I am linking up to:
2013 Finish-a-long hosted by Leanne @She Can Quilt
UFO Sunday hosted by Leah @ The Free Motion Quilting Project
WIP Wednesday hosted by Lee @ Freshly Pieced

* Shanna
Are you thinking of going scrappy this year?  If you have time, link up your posts each month with your own personal challenges.  Check out February post:  HERE