Saturday, February 9, 2013

Stash Report 6: My Little Helper


Here is my Stash Report through 02/09/2013:

Used This Week:  4 3/4 yards
Given this week:  0 Yards
Used/Given year to Date: 39 3/4 yards
Added This Week:  0 yards 
Added Year to Date: 10 3/4 yards
Net Used/given for 2013: +29 yards

See you tomorrow!
*Shanna

Friday, February 8, 2013

A Four Squared Finish (week 6)


I AM FINISHED!!!  

You cannot believe how excited I was last night just 5 minutes before my husband walked into the door from work, I knotted off the last thread for this project!  Oh my this project was a lesson at every corner.  After sewing together all the charm Squares for the last project involving the 'Lil Twister Tool  [see POST], I wanted to make a smaller projects without going with a  smaller tool.  I started this project about 2 years ago.  I never imagined this is how it would turn out, but I am so grateful to Leah Day's Tutorials and videos!  I used her method of joining the four separate mini-quilts into one 40"X 40" Project.  This marks my first finish for the 2013 Finish Along hosted by Leanne @She Can Quilt.

Four Squared Weekend:  Front

Four Squared Weekend:  back
I actually bought binding a couple of years ago from an Etsy Shop which is no longer in Business.  I hadn't actually planned out the quilt when I bought it however or I might have gone with something different, something Orange maybe.  All I knew at the time was that I had 4 packs of City Weekend Charm Squares by Moda and this binding should match.  There was a little less than a yard left of the binding.  I have decided to call it "Four Squared Weekend" and little corner bits were added to house a rod for hanging rather than the traditional sleeve.

I think I just might keep this one...

*Shanna

Linking up to:

2013 Finish-a-long hosted by Leanne @She Can Quilt (Via Flickr when projects are complete)
TGIFF Hosted by Kit @Kit Lang Art

WHOOP, WHOOP Fridays @Confessions of a Fabric Addict
Link A Finish Friday @ Richard & Tanya Quilt
Finish It Up Friday @ Crazy Mom Quilts
Let's Get Aquainted Mondays@ Plum & June (This week @Bold Goods)
Sew Cute Tuesdays @ Better Off Thread
Linky Tuesday @ Freemotion By The River
Fabric Tuesdays @ Quilt Story

Wednesday, February 6, 2013

City Weekend Project

"City Weekend, Hmmm"

Have you ever wondered where they get some of the names for the fabric lines?  I am sure it can be found in an interview somewhere on the interweb, but it is much more fun to make up stories and ideas in one's head instead, I should think.  I would share these fantastical stories I have made up for each line I play with, but I wouldn't want it to get back to the designers just in case there is something they might find offensive.  It does however keep me secretly amused as I sew. [laughter]

In progress, auditioning fabrics for joining strips


My lovely husband was good enough to get my computer back up and running (Ie. plug it in) so I could get caught up on Downton Abbey; the keyboard sticks a little but I can survive as long as I have a mouse and a bit of Tissue!  I have been attempting to watch while picking out the mess I made of a  free-motion-quilting stitch I tried to do on this project.  Leah Day I am not, but she assures her faithful followers that with practice and time (and perhaps a lot more practice) one might complete a new stitch she whips out as quick as a dream!


I decided to just wing it and go with a sort of doodle stitch that reminds me of 79.56% of my Public School Education.  Nothing against Public School Teachers, by the way,  I just owe my life to Librarians.  It's just I was often sent off to the Library because I was reading Persuasion while Dick and Jane were running, so I learned early it is easier to just read the textbook and to doodle.   And as usual, I digress.   I have almost decided to keep this quilt for a wall hanging, but we shall see.  My favorite Quilt is almost always the last I have completed or the one I just started!

Back
I plan to connect the bricks on this project using Leah Day's Quilt-As-You-Go Method.  We will have to see if I can get this one done.  I suspiciously hear Bob the Builder chanting in my head, but that might come from having an almost 1 year in the household who likes to repeat things.  I am also focusing on the Scrappy Hearts wall hanging I started about an hour after I got home with the fabric on Saturday.  You can see more about that on my Sunday List HERE.  The fabrics are gorgeous and I am so delighted with how they are going!

I have one last focus this week, which is some labels for two quilts I made last year [see POST].  Since one of them was auctioned off I wanted to wait to make a tag once the Winner was chosen, but someone wanted to buy the twin so I have that one to do as well.  I have been writing tags with a marker as I have seen by many of you out there, but if you go on Clover & Violet you will see tags/signature blocks of a different sort, one I really want to master--the art of embroidery.

Need to clean chalk lines off and then attached to Quilt #2
Fingers got  tired so this is where I am at for this Signature block
I need to cook a turkey tomorrow so hopefully I can get everything finished up and delivered tomorrow night.  Since I keep getting asked about the Turkey I will save you the time from wondering!  I am clearing up room in freezer and fridge for party food for Miss Z's First Birthday.  Plus Lent starts next week so trying to get temptations out of the house!
* Shanna

Sunday, February 3, 2013

BOM's Away



So I almost didn't make my 4th block for the local BOM in time, which would have meant that I would have to pay for the next block.  Thankfully, I made it in time and I went off on Saturday to show my block and pick up the next one!

The Legacy Sampler.  Temperance "T" (January BOM,  or Block 4)
The Legacy Sampler.  Star of Victory (December BOM,  or Block 3)

The Legacy Sampler.  Courage at Pickett's Mill (November BOM,  or Block 2)

The Legacy Sampler.  Woven Union (October BOM,  or Block 1)

The Legacy Sampler.  Soldiers Crossing (February BOM,  or Block 5)
I also have been making those test blocks of these blocks in the Martinique Fabrics rather than repeating them here,  I can do a recap of those blocks when I reveal my finished 5th Block in a few weeks.

I am also in progress on the 2nd Block in the Sugar Block Club BOM, the first Block of the Craftsy BOM, and both Block 1& 2 of the Skillbuilder BOM being held at PileOFabric.  I dropped making the block of the Week for the Women's Right to Vote Along.  I kept trying to make the blocks but it didn't work for me.  I need a consistent level of instructions and this Block of the Week just varied too much.  It almost seemed to depend too much on the Block program to make or obtain the templates.  I may be mistaken, but I think its for the best that I leave off working on this one.  I think it will all work out in the end, especially since I have found a couple BOM's that I think I will really enjoy.  My hope though is I can really stick with it.  I plan to link up to the BOM's AWAY linky and then take a look at what others are doing about the web!

See Ya Later!
*Shanna

UFO/WIP 6


I am still so happy that I made the link-up party for the first quarter, but now its time for an update on my list!  I made strong in roads to my WIP/UFO List in the month of January.  I Have 2 pieced tops (1 has backing complete & neither have binding prepared). Next I tackled some clothing items as I wait to buy batting to finish off those quilts, no clothing projects were actually completed off my list though. Nothing is counted unless it is completely finished though so I better get working!!


Still In Process:
Christmas Advent Calendar:  Rip out all the stitching again, I ran out of thread on accident can purchase exact color. [enter in head banging against wall picture here, lol]  I wish I could steal the batting!
City Weekend Project:  Working on ripping stitches out, need to pick out joining/sashing fabric.  This is now going to be one quilt--Writing a post about it this week

Dusty Rose Quilt:   I have figured out a new pattern for this quilt; currently in 4-patch and 2-patch segments, needs some love

Dot Explosion Quilt This needs some reworking in concept.

Easy Street Mystery Quilt:  all the 4-patch blocks & Flying Geese are assembled (I am making half the blocks required for a smaller quilt ), I am currently using this as my Leaders & Enders project in between and around other projects (See Quiltville blog).
February's Scrap Challenge Project:  Partly pieced, process post coming soon
Fish Quilt:  Frustrating and hated pattern but I am trying to complete anyways.
HST Scrap Project:  Fabric Trimmed, squares set ready to sew

I'll Fly Away Quilt:  Pieces cut but this one is a long time project.  Since I am planning for this to fit our bed there with be many, many flying geese that needs to be made; I am guessing this one will take 3 months in among all the other projects.
March's Scrap Challenge Project:  Project kit ready to go with fabric cut from chosen pattern
Martinique Strip Quilt:  Need to assemble more strips.


Playdate Dress:  I had forgotten about this dress until I was organizing

Poppy Wall Hanging:  No progress for a while
Rainbow Block Quilt:    I have made this my orphan rainbow block quilt
Squares & Patches Quilt:  I have almost made a choice on the ideas you gave me! 


Summersault Patch Quilt:  Need to assemble more strips, some are sewn into two strip blocks

Two + Two Blouse:   I had forgotten about this blouse until I was organizing

Z's Birthday Dress:  Bodice is mostly completed, skirt is pinned and fitted to space, Sash is completed. 

Limbo-landed Items:
Chain Quilt:  Top is complete, back & bindings in process; in limbo until new batch of batting.
Red Eye Quilt:  Top & backing complete, & bindings are in process [POST]in limbo until new batch of batting.


Completed Items:
Coming Soon

New Items not on First Quarter List:


C2's Dress:  Bodice is Assembled, Skirt is cut, Sash is complete, waiting on measurements for length

Scrappy Hearts:  A Wall Hanging for Decor using the Flirt line of fabric



I am linking up to:
2013 Finish-a-long hosted by Leanne @She Can Quilt
UFO Sunday hosted by Leah @ The Free Motion Quilting Project
WIP Wednesday hosted by Lee @ Freshly Pieced

* Shanna
Are you thinking of going scrappy this year?  If you have time, link up your posts each month with your own personal challenges.  Check out February post:  HERE

Saturday, February 2, 2013

Stash Report 5

Scrap bag, which is going to be used for the Sugar Block Club BOM



Here is my Stash Report through 02/02/2013:

Used This Week:  0 yards
Given this week:  16 Yards
Used/Given year to Date: 35 yards
Added This Week:  6 yards 
Added Year to Date: 10 3/4 yards
Net Used/given for 2013: +24 1/4 yards

I am so excited that I have been organizing my fabric as it has allowed me to purchase less fabrics and get more used up.  I do not count fabric used until the whole project is completed.  I do add in the fabric received for the BOM even though I will not count the fabric used until the whole quilt is completed.

So then why are there pictures of fabric on this post? Well....I was at the check out with baby girl to purchase the scrap bag of fabrics I am thinking will really work for the Sugar Block Club BOM, when I saw the prettiest little wall hanging on the wall right behind the cashier.  It turned out to be a free pattern written by one of the Ladies that works at the store and it uses Sandy Gervais' Flirt line by Moda.  Since I do not have very many valentiney decor, I simply gave in and purchased the materials.  I was thinking that if I hurry up and get it completed this week then I can use it at Miss Z's First Birthday as part of the decor...seems justified, right?  well, I just need to follow through now.  
See ya tomorrow!
*Shanna

Finishes 5

Z's Birthday Dress
So, I set out to get some clothing completed, but as usual I got a little distracted!  I did make quite a bit of headway with her dress, but got stalled at the portion where I need to pin and gather the skirt which is not exactly smart to do with such a curious child about!

I am not really worried right now that Baby Girl will be without clothing as many have graciously supplied her with an abundance of clothing via baby showers before she was born.  Well on top of that we have a doting grandmother and several ladies at my Church who seem to remember Z when they are shopping or go to a garage sale.  My problem this week as I was sorting through clothes is I really had no good place to put her items so time to do a little fabric organization!

February 1st, 2013
I have decided to keep these bins right on the table as you see it now because I think it is going to work for me.  I realized today that I have an idea of what color fabric I need for a project so I only go to the particular bin, not even glancing at the others.  With the bins up I found the perfect fabric for the Sash for Z's Birthday dress (photo above) so I did not have to order as I had intended.  I also was able to add Border fabric to a WIP Quilt Top and find fabric to make the backing right away (Photos below)!

Completed Quilt top

Backing for Quilt
I also was able to add Border fabric to a WIP Quilt Top and find fabric to make the backing right away (Photos below)!  You wouldn't believe how excited I was when I spied a couple fabrics I now plan to use to make the backing for the "Chained" Quilt top I finished last Thursday [POST].  One of the fabrics was actually purchased for that quilt, but I honestly had forgotten about it.  It is so nice to have most of my fabrics organized again!  There are a few bits and pieces scattered about, but hopefully if I can swipe adopt a shelf from the dining room I should have a  place to put all my displaced items (in my own bedroom!!!!) that needs to be to move to make room for Z's clothing in her room!

Not a huge amount of finishes per se, but I feel the fabric organization is worth it!  I did hate to cut into the Yellow, but I would much rather have a quilt back and not be tempted when Z and I go to the Quilt store tomorrow to pick our BOM.  I think I am going to let Miss Z pick out another scrap bag because she has been carrying around the last one every day, stopping to pet her fabric.  I am debating though, should I leave the fabric be or make a little something with the fabric?

Linking up to:

TGIFF Hosted by Laura@Quokka Quilts
WHOOP, WHOOP Fridays @Confessions of a Fabric Addict
Link A Finish Friday @ Richard & Tanya Quilt
Finish It Up Friday @ Crazy Mom Quilts
Fabric Tuesdays @ Quilt Story


Thursday, January 31, 2013

It's A Scrapful Life: February

Greetings!  I am getting things organized over here and boy do I like making lists!!  I saw Judy's POST about listmaking last month and I knew I had to join up. You list the 4 things you want to accomplish for the month.  It shortens my UFO list to give me focus.

So Getting it Done:

1.  Sugar Block Club, Block 2
2.  Craftsy BOM, Block 1 & 2
3.  Legacy Sampler, BOM Block 5
4.  Complete Easy Street Quilt Lap Quilt

I hope to:

1.  Finish February Scrap Project
2.  Finish January Scrap Project
2.  Finish 2 additional UFO's

So I am also back with my own challenge for February.  I still have some of that fabric left over from a binge on Moda Scrap Bags a couple of years ago, so I endeavor to find something to do with them.   Here is my challenge for February to myself:
1933 by Chloe's Closet (A Moda Line)
What are your suggestions?  Okay, now your turn, shop your stash and scraps, what will you challenge yourself with this month?  Don't forget to link your finished projects up to the Flickr group:  A Scrapful Life

I have not been great about adding pictures of my progress on my January Project, but they will be added later today.  I am getting close to having this one completed!  I am also very excited because instead of purchasing fabric for the sash for Z's Birthday Dress, I found something that would work from my Stash! [see pictures HERE]

*Shanna

Wednesday, January 30, 2013

Another Lustful Fabric Moment

Have you ever had a fabric line that follows you around?  I mean everywhere I turn I see little snippets of this line named Simply Color [From Moda by V and Co.] and I actually like it and I think I am starting to fall in love with it!  Even whilst I am trying to clear out my own stash I cannot seem to help drooling for these lovely prints...


Do you think my husband will get the subtle hint that I might want some of this lovely fabric for my birthday if I post pictures of a Fat Quarter set all over the house?  Lets see and I will let you know...


Perhaps I should just link this blog post on his facebook page...lol.  I mean he has until the end of March and then on to our Anniversary in April!  Unless I go strictly with the PB&J line (POST HERE)

* Shanna

Sunday, January 27, 2013

UFO/WIP 5

Well I am pleased that I am making progress on some things but let em be honest, I really need a completed project to make me feel a little better!  It will be a bit before I can pick up more batting so the finished tops do not count until they are quilted and bound with nothing left to do on them.  You can see the full UFO/WIP List I am going off for the Finish-a-long first quarter (with pictures) HERE--to be updated next week!!. So lets get some clothing items completed this week!


Playdate Dress:  I had forgotten about this dress until I was organizing
[Updated: 01/30/2013, new pictures added of Z's Birthday dress]
Z's Birthday Dress:  Bodice is mostly completed, skirt is pinned and fitted to space, Sash is completed.    
Z's Birthday Dress:  A close up of the finished Sash by the cut skirt fabric
 When I pulled the left over yardage out I figured out there was enough to cut the same dress for Z's older Cousin!  She has a birthday this summer, but for now we are just making her a coordinating dress!  I used some of the pink yard I bought a couple of weeks ago for the lining and Sash for her dress.  I haven't decided on if I will use a Zipper, Snaps, buttons or velcro.  What do you think works best for a child?  My husband is voting Zipper for Z, but she is turning 2, her cousin is 5 this summer.  Oh, I was so excited that at the last minute I decided not to order the Sashing fabric because I happened to spy the fabric above in my Stash as I was passing by.  I have all the containers open, lidless, and leaning against the wall to iron, fold and organize any yardage that has meandered out of their place or new items I may have purchased in the past couple of years that are just floating around my craft area.  I have to remember to shop my Stash more often!!
C2's Dress:  Bodice is Assembled, Skirt is cut, Sash is complete, waiting on measurements for length

I am linking up to:
2013 Finish-a-long hosted by Leanne @She Can Quilt (Via Flickr when projects are complete)
UFO Sunday hosted by Leah @ The Free Motion Quilting Project
WIP Wednesday hosted by Lee @ Freshly Pieced

* Shanna
Are you thinking of going scrappy this year?  If you have time, link up your posts each month with your own personal challenges.  Check out January post:  HERE