Sunday, January 13, 2013

Finish Along 2013-First Quarter (UFO/WIP 3)


I MADE IT!!  I missed every single link up for last years finish along so I am so excited to be able to catch it on the first quarter! <insert a picture of me jumping up and down here, lol>  Now I am putting every WIP/UFO I have started or have prepped.  Nothing is counted unless it is completely finished though so I better get working!!



Chain Quilt:  Need to place the quad-blocks, sandwich  stitch and bind!

Christmas Advent Calendar:  Rip out all the stitching again, I ran out of thread on accident can purchase exact color. [enter in head banging against wall picture here, lol]
City Weekend Project:  We are back to table toppers/wall hangings

Dusty Rose Quilt:   I have figured out a new pattern for this quilt; currently in 4-patch and 2-patch segments, needs some love

Dot Explosion Quilt This needs some reworking in concept.

Easy Street Mystery Quilt:  all the 4-patch blocks & Flying Geese are assembled (I am making half the blocks required for a smaller quilt)
February's Scrap Challenge Project:  Fabric Trimmed ready to design
Fish Quilt:  Frustrating and hated pattern but I am trying to complete anyways.

HST Scrap Project:  Fabric Trimmed, squares set ready to sew

I'll Fly Away Quilt:  Pieces cut but this one is a long time project.  Since I am planning for this to fit our bed there with be many, many flying geese that needs to be made; I am guessing this one will take 3 months in among all the other projects.
March's Scrap Challenge Project:  Fabric chosen

Martinique Strip Quilt:  Need to assemble more strips, some are sewn into two strip blocks



Playdate Dress:  I had forgotten about this dress until I was organizing

Poppy Wall Hanging:  No progress for a while

Rainbow Block Quilt:    I will write more about this tomorrow.

Red Eye Quilt:  Making adjustment to top, then needs to be sandwiched & Finished
Squares & Patches Quilt:  Working out plan with pattern


Summersault Patch Quilt:  Need to assemble more strips, some are sewn into two strip blocks

Two + Two Blouse:   I had forgotten about this blouse until I was organizing















Z's Birthday Dress:  I have yardage picked out!  See Here for your opinion on Sash fabric!
Okay,That is 20 projects to be completed in 3 months!  I am really hoping I get them all done plus get started on several others, afterall I have to have something to put on my list for next quarter!

I am linking up to:
2013 Finish-a-long hosted by Leanne @She Can Quilt
UFO Sunday hosted by Leah @ The Free Motion Quilting Project
WIP Wednesday hosted by Lee @ Freshly Pieced

* Shanna
Are you thinking of going scrappy this year?  If you have time, link up your posts each month with your own personal challenges.  Check out January post:  HERE

2 comments:

  1. Wow, you go girl! Don't forget to sleep and eat! Can't wait to see what you do, Shanna. Can Z be any cuter?!

    ReplyDelete
  2. Whew I am tired before you start good for you. Well organized and positive attitude. I am sure you will get Eric done.

    ReplyDelete

I love to hear from my readers!